Are you constructing a new house? Constructing a new house requires the knowledge of your requirements, features of your land, planning of your building, getting the necessary permits and finally beginning the construction of the house.

If you are starting to build a house, you must follow these steps and sub-steps.

Planning

There are different stages of Planning. Planning is a long and often times a tedious process. If you choose a good team of engineers and architect, they will make the planning process very enjoyable, effective and result oriented for you in very little time.

Knowledge of your requirements

You must have a requirement before you present your needs in front of your architect. Your architect can help you with your requirements, but you must tell about your particular habits and requirements so that architects can propose better room sizes for you.

You must also care about the future requirements of the family members. For example, your children might be planning to settle abroad in the future and they might be very sure about this. If you are planning a store and a recreation room along with children room, you might not require a store room in the near future because your children are not living in your house forever.

Features of the Land

The features of the land are what it determines the optimum planning of your house. If you have a sloped land, you could plan a bungalow styled house if you don’t want an underground room. If you want underground rooms, your design will be changed and you will be going for a semi-bungalow design of the house.

If your land is irregular but you don’t like irregular rooms, you might end up having a low built up area and a building with more height. If you are ok with irregular rooms, you might cover the entire permissible coverage area.

Planning of Your Building

After you discuss your requirements and the architects find out the features and the present landscape of the land, they will draft a building plan for your discussion. At this stage, you will seek measures for optimizing the space management of your home. For example, you might shift walls to get extra space for accommodating laundry space or to add extra cupboard for a mini bar. You sacrifice the space you won’t utilize much and gain space which you will use very effectively.

Final Drafting and Approval from Municipality

After initial planning, the architects and engineers draft the building architecture and structure plans, elevations and sections for your building and submit them to the Municipality on your behalf. They will be responsible for the approval because they will have to follow all the bye laws of the municipality.

Construction Stages

After getting permit from the municipality, it’s time for you to start your construction works. Your construction works will start with layout and typically end with painting. The stages of constructing a typical RCC House is given below:

Making Layout

You will select a contract or a construction company depending on whom you are going to put your faith on. The selected party will first do the site clearance and will make the layout. The foundation will be dug and the drawing will be followed to carry out the rest of the works.

Casting of Foundation

It’s time to cast the foundation according to the drawing. You must strictly follow the drawing because it will make your house bear load according to what the standards have laid out. Your building will bear all the loads such as snow load, wind load, earthquake load and the live load. You must not compromise on the concrete ratio and mortar ratio in the foundation.

Carrying Out Superstructure Works

After you reach the plinth level, you will start doing the superstructure works. You first cast the columns, then you cast the beam and slab together. The together casting of beam and slab is called monolithic casting of slab. Then, interior walls and exterior walls along with sill, lintel, window and beam are casted. You might be interested to read about the technical terms of a RCC building.

Interior Finishing

After doing all the structural works, it’s time to do the interior finishing. You do plaster, plumbing and electrical lines along with tiles and marbles. The rate at which you do these jobs vary so much.

Exterior Finishing

After Interior Finishing, you can start the exterior finishing. You might carry out interior and exterior finishing together. Exterior finishing also involves plaster and painting jobs.

You can also read about the steps of constructing your RCC House in detail. 